SENZE ENERGY
News Information

News & Information

VIEW MORE
scroll down

Public Participation Second Announcement of Environmental Impact Assessment for the Paste Filling Mining Project of Shanxi Liulin Xinfeng Xia Shanmao Coal Industry Co., Ltd.

Classification:

News

Group News

Author:

Source:

Release time:

2025/03/18

Visits:

Information Summary:

According to the "Environmental Impact Assessment Law of the People's Republic of China", an environmental impact assessment report is required for this project. In accordance with the relevant provisions of the "Public Participation in Environmental Impact Assessment" (Ministry of Ecology and Environment Order No. 4), the second information disclosure for the "Shanxi Liulin Xinfyishanma Coal Mining Co., Ltd. Grouting Filling Mining Project" is hereby announced. The relevant information is as follows:


The surface filling system of the Xinfei Xia Shanmao Coal Mining Co., Ltd., in Liulin, Shanxi, for its paste filling mining project is located in the industrial square. The main raw materials for filling are gangue and binder. The filling system capacity is designed to be200m³/h8No. coal seamThe designed production capacity of the filling mining is30ten thousandt/a,The finished paste filling material is pumped to the filling working face through a special high-pressure pump and seamless wear-resistant steel pipes. The filling system consists of a aggregate processing system, a proportioning mixing and pumping system, a pipeline system, and a filling working face system. The newly constructed facilities mainly include: gangue stacking shed, gangue crushing workshop, crushing workshop dust removal system, belt gallery to raw gangue bin, gangue buffer bin, belt gallery to filling building, filling building, filling hall, pipe and valve room, powder bin, integrated control and experiment building, power distribution room, air compressor room and other production buildings and structures.

According to the "Environmental Impact Assessment Law of the People's Republic of China", an environmental impact assessment report needs to be prepared for this project.According to the Ministry of Ecology and Environment Order No.4《Methods for Public Participation in Environmental Impact Assessment》In accordance with the relevant provisions ofNowto“Xinfei Xia Shanmao Coal Mining Co., Ltd., in Liulin, Shanxi, paste filling mining project”conduct the second public information disclosure.Relevant information disclosureisas follows:

(1) Network link to the full text of the draft environmental impact assessment report and ways and means to check the paper report

Environmental Impact Assessment Report of Xinfei Xia Shanmao Coal Mining Co., Ltd., in Liulin, Shanxi, Paste Filling Mining ProjectReport(Draft for Comments)Network link: https://pan.baidu.com/s/1sRCK1MIpwIqVigvLCfIcPQExtraction code': hkfn'The public can contactXinfei Xia Shanmao Coal Mining Co., Ltd., in Liulin, Shanxito borrow this project's environmental impact assessment reportDraft for Comments)。

(2) Public Scope for Soliciting Opinions

Scope of public opinion solicitation: Units and individuals directly or indirectly affected by the project, as well as units and individuals concerned about the project construction.

(3) Network Link to Public Opinion Form

Public Opinion FormNetwork link:https://pan.baidu.com/s/1zI_rIK9PCkq-8-orNfBHzAExtraction code': hxqd'

(4) Ways and Means for the Public to Submit Opinions

Please submit your opinions or suggestions to the construction unit by telephone, email, or written letter. Individuals should provide their real names and contact information, and units should provide their contact information and affix their official seals to facilitate information feedback. Specific contact information is as follows:

Construction unitXinfei Xia Shanmao Coal Mining Co., Ltd., in Liulin, Shanxi

Address:Xinfei Xia Shanmao Coal Mining Co., Ltd., Renjiashan Village, Xi Wangjiagou Township, Liulin County, Lvliang City, Shanxi Province

Contact person:Liu Yongzhi

Contact number:18935171779

Email:313149495@qq.com

(5) Start and End Time for Public Opinion Submission

Within10working days after the announcement is issued, the construction unit and the environmental impact assessment unit will collect public opinions and suggestions.

 

Xinfei Xia Shanmao Coal Mining Co., Ltd., in Liulin, Shanxi

                                                  2025Year2Month14Day

Key words:

Senze Group

Senze Energy

Related News

视频标题