Public Notice of the Environmental Impact Assessment for the Grout Filling Mining Project of Shanxi Liulin Xinfeng Xia Shanmao Coal Industry Co., Ltd.
Classification:
Group News
News
Author:
Source:
Release time:
2025/03/18
Visits:
Information Summary:
The ground filling system is located in the industrial square, with the main raw materials for filling being coal gangue and binder. The filling system capacity is designed to be 200m³/h, and the maximum filling and mining design production capacity is 500,000t/a. The finished slurry filling material is delivered via a special high-pressure pump
Shanxi Liulin Xinfei Xia Shanmao Coal Industry Co., Ltd.
First Public Announcement of Environmental Impact Assessment for the Grouting Filling Mining Project
(1)Project Name andBasic Information on Construction Content
Project Name:Shanxi Liulin Xinfei Xia Shanmao Coal Industry Co., Ltd. Grouting Filling Mining Project
Construction Content:The ground filling system is located in the industrial square, and the main raw materials for filling are gangue and binder. The design capacity of the filling system is200m³/h,The maximum design production capacity of filling and mining is50ten thousandt/a,The finished grout filling material is pumped to the filling working face through a special high-pressure pump and seamless wear-resistant steel pipe。The filling system consists of aggregate processing system, proportioning mixing and pumping system, pipeline system and filling working face system. The newly constructed facilities mainly include: gangue shed, gangue crushing workshop, crushing workshop dust removal system, belt gallery into the final gangue bin, gangue buffer bin, belt gallery into the filling building, filling building, filling hall, pipe valve room, powder bin, integrated control and experiment building, power distribution room, air compressor room and other production buildings (structures).
(2)Name and Contact Information of the Construction Unit
Construction Unit:Shanxi Liulin Xinfei Xia Shanmao Coal Industry Co., Ltd.
Contact Person:Kang Yonggang
Contact Number:13994830303
(3) Name of the Environmental Impact Report Compilation Unit
Environmental Assessment Unit:Shanxi Renhezhiyuan Environmental Consulting Co., Ltd.
(4) Network Link of the Public Opinion Form
Link:https://pan.baidu.com/s/1-eitd81nvYCdiCs1SNsGDw
Extraction Code:yzkz
(5) Ways and Means of Submitting Public Opinion Forms
Relevant interested units and individuals can submit opinions and suggestions to the construction unit through letters, emails, and telephone calls.
Mailing Address:Shanxi Liulin Xinfei Xia Shanmao Coal Industry Co., Ltd., Renjiashan Village, Xi Wangjiagou Township, Liulin County, Lvliang City, Shanxi Province
Recipient:Liu Yongzhi
Contact Number:18935171779
Email:313149495@qq.com
Shanxi Liulin Xinfei Xia Shanmao Coal Industry Co., Ltd.
2024Year2Month20Day
Key words:
Senze Group
Senze Energy
Related News